The Semi-Peak-Load Operation Of A Canal Regulating Water Power Plant
Main Article Content
Abstract
This paper deals with a description and presents the results of the calculations of possibilities of the semi-peak operation of a canal regulating water power plant. These plants are of a great significance for the electric system. The largest Slovakian canal regulating water power plant is the Gabčíkovo power plant. The semi-peak operation would represent a compromise between the originally designed peak operation and the basically forced continuous-flow operation, where by the existing state of the waterworks on the Danube River would have to be accepted.
Article Details
Issue
Section
Generation of Electricity, Transmission, Distribution and Consumption of Electricity
Authors of the contribution acknowledge that the contributed article has not been up to the day published in any journal, neither has it been submitted for publishing in another journal. At a time, Authors delegate to the editorial board of ELEKTROENERGETIKA journal the authority to publish the contributed article on the journal Internet WEB page (http://jeen.fei.tuke.sk) at understanding that the journal editorial board assumes no responsibility for damages suffered due to use of acts, methods, products, instructions for use or other ideas published by the article authors, neither for by them advertised information. Authors represent that they are fully aware of the fact that articles are not being linguistically corrected by the journal editorial staff, and that they hence assume unlimited responsibility for lingual correctness.