Mathematical Model of the Váh Cascade
Main Article Content
Abstract
The optimal operation of an electrical power supply subsystem results from respect for the effectiveness criterion for the control of an industrial enterprise. It is essential for the operation of the SE-VET – a significant hydro-energy system. The fundamental principle of this operation is the potential hydropower utilization of water courses of the SE-VET in addition to planning the control of SE system.
Article Details
Issue
Section
Generation of Electricity, Transmission, Distribution and Consumption of Electricity
Authors of the contribution acknowledge that the contributed article has not been up to the day published in any journal, neither has it been submitted for publishing in another journal. At a time, Authors delegate to the editorial board of ELEKTROENERGETIKA journal the authority to publish the contributed article on the journal Internet WEB page (http://jeen.fei.tuke.sk) at understanding that the journal editorial board assumes no responsibility for damages suffered due to use of acts, methods, products, instructions for use or other ideas published by the article authors, neither for by them advertised information. Authors represent that they are fully aware of the fact that articles are not being linguistically corrected by the journal editorial staff, and that they hence assume unlimited responsibility for lingual correctness.